Work has been rather overwhelming lately. The casino I work at is opening a new hotel, and some of the side effects are creating some exceptional problems in my job.
I am a stationary engineer, soft of a glorified boiler operator, working the night shift - 11 pm to 7 am. The new hotel uses steam piped over from the existing boiler room to run the heating, hot water, etc.
This is not a problem, in theory, for the boiler capacity. We have big boilers. The problems have all been related to feed water supply to the boilers.
After a few weeks struggling with water flow failures, we have concluded the amount of garbage in the condensate return line warrants cleaning the strainers multiple times per day.
Since there has been NO garbage in the pipes since the boiler plant was put into service in 2002, this is a drastic change in our maintenance policy.
I have no desire to start a war over how we ended up with cut up sheetmetal, pieces of plastic, and what appears to be sand in the condensate returns. I was expecting the oil and metal chips from thread cutting - I have threaded pipes myself and know it can happen. The other stuff we just have to grit our teeth and deal with.
The long hours create big paychecks, but I would prefer sleep.
I am a stationary engineer, soft of a glorified boiler operator, working the night shift - 11 pm to 7 am. The new hotel uses steam piped over from the existing boiler room to run the heating, hot water, etc.
This is not a problem, in theory, for the boiler capacity. We have big boilers. The problems have all been related to feed water supply to the boilers.
After a few weeks struggling with water flow failures, we have concluded the amount of garbage in the condensate return line warrants cleaning the strainers multiple times per day.
Since there has been NO garbage in the pipes since the boiler plant was put into service in 2002, this is a drastic change in our maintenance policy.
I have no desire to start a war over how we ended up with cut up sheetmetal, pieces of plastic, and what appears to be sand in the condensate returns. I was expecting the oil and metal chips from thread cutting - I have threaded pipes myself and know it can happen. The other stuff we just have to grit our teeth and deal with.
The long hours create big paychecks, but I would prefer sleep.